Assist the project manager or project engineer on a daily basis on-site.
Able to read and understand all facade shop drawings in detail.
Able to operate the gondola, building maintenance unit (BMU) and boom lift during troubleshooting in facade installation.
Coordinate with the surveyor with regards to the facade brackets and frame leveling as well as positioning as per facade setting out and shop drawings.
Arrange work as per schedule and allocate workers for the various installation works.
Supervise the work done by our curtainwall and cladding installer team.
Work closely with other site operation staff to ensure that the project schedule is met.
Ensure that the curtainwall/cladding installation is as per approved shop drawings.
Closely monitor the progress and quality of work being performed by the workers.
Ensure that works are executed within an acceptable standard of workmanship.
Work closely with the safety department to ensure that permit-to-work has been approved prior to commencement of works.
Prepare daily progress report using elevation drawing and report it to the project manager.
Coordinate with supplier for materials delivery to ensure that materials for installation are available.
Liaise with the main contractor for storage location on site.
Coordinate with the main contractor for access arrangement so that access is available to facilitate installation.
Attend the daily toolbox meeting and convey clear instructions accordingly to ensure that the team complies with all necessary in-house safety rules.
Attend site coordination meetings and site walks when required by the main contractor.
Understand and ensure compliance with project requirements and scope of work.
Ability to work under pressure in the fast paced construction environment.